● Production line efficiency analysis
● Equipment verification
● Working method review
● Environmental condition estimation
● Action planning preparation and analysis
● Practical trials with the working team
● Follow up and control of the results
Consultation (bloc of 4 hours minimum):
Supporting program to improve productino line according to the needs :
- Production line efficiency analysis,
- Wording method review,
- Equipment verification,
- Results presentation and suggestions.
Conditions: A notice of 72 hours minimum is required to schedule the consultation and the training. The costs are established according to the consultation and training needs. For elaborated consultation and training, there is two different programs available; Silver and Bronze. Contact one of our Sales Representative for more information.

